D​esign and oversee execution for a 500 tons/day Municipal Solid Waste Facility
01
D​esign and oversee execution for a 500 tons/day Municipal Solid Waste Facility
 
Tender Documents and Method Statement for MSW Collection Services & Public Cleaning in Lebanon
02
Tender Documents and Method Statement for MSW Collection Services & Public Cleaning in Lebanon
 
Operational Environmental Management Plan
03
Operational Environmental Management Plan
 
Environmental Management System Inspection
04
Environmental Management System Inspection
 
Local Market study Waste-to-Energy
05
Local Market study Waste-to-Energy
 
Environmental consulting for Bourj Hammoud sanitary landfills
06
Environmental consulting for Bourj Hammoud sanitary landfills
 
Environmental Impact Assessment (EIA) study for the construction of Aadloun Port project
07
Environmental Impact Assessment (EIA) study for the construction of Aadloun Port project
 
Environmental Impact Assessment (EIA) study for the construction of Boqaata Dam
08
Environmental Impact Assessment (EIA) study for the construction of Boqaata Dam
 
D​esign and oversee execution for a 500 tons/day Municipal Solid Waste Facility
Title: D​esign and oversee execution for a 500 tons/day Municipal Solid Waste Facility
Client: AMB-Nicollin s.a.l.

Al-Faihaa Facility sorting plant located in Tripoli can treat an average of 500 tons daily located, serving more than 500,000 citizens, creating more than 60 jobs, diverting more than 80% of waste away from landfill sorting recyclables, and generating compost and RDF material.


D​esign and oversee execution for a 500 tons/day Municipal Solid Waste Facility
Tender Documents and Method Statement for MSW Collection Services & Public Cleaning in Lebanon
Title: Tender Documents and Method Statement for MSW Collection Services & Public Cleaning in Lebanon
Client: KHOURY CONTRACTING

  • Metn Caza,Kesrouan Caza and Jbeil Caza
  • Beirut Governorate
  • Baabda Caza

The project consists of a comprehensive and fully integrated public cleaning & collection study. The assessment was all-inclusive of Collection Methodology, Disposal Methodology, Management & Operation methodology as well as a Marketing proposal to back up the intended performance at the time.

Tender Documents and Method Statement for MSW Collection Services & Public Cleaning in Lebanon
Operational Environmental Management Plan
Title: Operational Environmental Management Plan
Client: ADC and QATARI DIAR

The primary objective of support in this project is to assist ADC Energy Systems and the future operator to meet the current requirements of the MoE and to obtain MoE’s environmental approval for the future operation of the facility.
The Operational Environmental Management Plan (OEMP) has been structured to generally confirm the requirements of the Environmental Management System. Standard ISO: 14001:2004

Operational Environmental Management Plan
Environmental Management System Inspection
Title: Environmental Management System Inspection
Client: UNION OF JEZZINE

A study that conducted an environmental inspection for the management system in La Maison de la Foret to verify if they are implementing the ISO 14001-2004.

Environmental Management System Inspection
Local Market study Waste-to-Energy
Title: Local Market study Waste-to-Energy
Client: Hunan Industrial Equipment Installation Co. and And Shenzhen Energy Environment Engineering Co.

The project is mainly about analyzing the market size, the technology needed, tender prequalification, as well as a feasibility study for the process.

Local Market study Waste-to-Energy
Environmental consulting for Bourj Hammoud sanitary landfills
Title: Environmental consulting for Bourj Hammoud sanitary landfills
Client: KHOURY CONTRACTING

Environmental consulting for Bourj Hammoud sanitary landfills construction of sanitary landfill cells 249,100 m2, Implementation of land reclamation areas 216,900 m2, Excavation and removal of the Bourj Hammoud old dump: 3,500,000m3, Construction of the breakwaters using Concrete Armor Blocks 3054ml.


Environmental consulting for Bourj Hammoud sanitary landfills
Environmental Impact Assessment (EIA) study for the construction of Aadloun Port project
Title: Environmental Impact Assessment (EIA) study for the construction of Aadloun Port project
Client: KHOURY CONTRACTING
Environmental Impact Assessment (EIA) study for the construction of the Aadloun Port project - located in Aadloun, Caza of Saida in South Lebanon - that includes the construction of Breakwater length 630lm, Crest wall, Quay equipped with bollards, lighthouse, and fuel chamber and Slipway.


Environmental Impact Assessment (EIA) study for the construction of Aadloun Port project
Environmental Impact Assessment (EIA) study for the construction of Boqaata Dam
Title: Environmental Impact Assessment (EIA) study for the construction of Boqaata Dam
Client: KHOURY CONTRACTING
Environmental Impact Assessment (EIA) study for the construction of Boqaata Dam a 7 Million m3 water reserve with a structural height of 71 m, Volume of Roller Compacted Concrete 160,000m3, Volume of Conventional Vibrated Concrete 50,000m3, and Excavation of 1,000,000 m3.


Environmental Impact Assessment (EIA) study for the construction of Boqaata Dam